In 2015 the eThekwini Municipality began a process of preparing multiple Water Use Licence Applications (WULA), and in some cases Coastal Waters Discharge Permits (CWDP), for the 15 Waste Water Treatment Works (WWTWs).

The applications and specialists studies were to be put together by Golder and Associates and WSP.  Phelamanga was appointed to undertake the public participation process for these applications; as they happened over the ensuing two years. Newspaper advertisements were placed as each application was prepared by the consultants. Stakeholders then had an opportunity to (pre)-register as an Interested and Affected Party (I&AP) and when relevant they were advised of the public meetings in their areas.


The 15 WWTW were:

• Amanzimtoti
• Dassenhoek
• Hammarsdale
• Isipingo
• Kingsburgh
• KwaMashu
• KwaNdengenzi
• Mkhomazi
• Mpumalanga
• Northern Works
• Tongaat
• Umbilo
• uMdloti
• Umhlanga
• Umhlatuzana

The project came to a close before all the Public Meetings could be held, this was due to multiple factors beyond the control of the Phelamanga Team. The following activities were undertaken in relation to the project:

Amanzimtoti WULA

The Amanzimtoti WULA public meeting was held on the 11 August 2015, at the Amanzimtoti Civic Centre. At the meeting the public were invited to give comment for inclusion in the draft report to go with the WULA.
The BID document with comment sheet is available here: Amanzimtoti BID
The minutes of meeting can be found here Minutes

The comment period for the Amanzimtoti WULA closed on 23 September 2015

Kingsburgh WULA

The Kingsburgh WULA public meeting was held on the 12 August 2015, at the Amanzimtoti Civic Centre. At the meeting the public were invited to give comment for inclusion in the draft report to go with the WULA.
The BID document with comment sheet is available here: Kingsburgh BID
The minutes of meeting can be found here Minutes
The comment period for the Kingsburgh WULA closed on 23 September 2015

Tongaat WULA

The Tongaat WULA public meeting was held on the 13 August 2015, at the V Moonsamy Community Centre. At the meeting the public were invited to give comment for inclusion in the draft report to go with the WULA.
The BID document with comment sheet is available here: Tongaat BID
The comment period for the Tongaat WULA closed on 23 September 2015

The Tongaat WWTW Draft Report Meeting

The Tongaat WWTW Draft Report meeting was held on Thursday 1 October 2015, the minutes of the meeting are here.
A copy of the presentation can be found here. (Please note the document is 2.3MB)
The comment period was open through to 30 November 2015
The full Draft Report was prepared by Golder and Associates. The report can be found here.